2014年11月2日星期日

according to the publicity of the project planning

October 22nd news: in the future, taking Shanghai subway line 2 or line No. 16 to Longyang Road station passengers, or Cheap Ravens Jerseys will be directly through the transfer channel, arrived at the Longyang Road maglev station. Yesterday, the "Shanghai rail transit line 16 Longyang Road station on line 2, line 7 transfer channel of new reconstruction project" planning and design to the community publicity.

according to the publicity of the project planning, in order to meet the needs of line 16, Cheap Packers Jerseys Longyang Road station transfer passenger flow, the existing Shanghai Metro Line 2 and line 7 will respectively reconstruction, new transfer channel. In particular: Line 2 Longyang Road station of No. 2 mouth, add a new channel for line 2 and line 7 magnetic transfer channel; the original 6 opening new route, line 2 and line 7 transfer channels and export. In addition, Longyang Road in the Longyang Road maglev station and station on line 16, the construction of a transfer channel, between for magnetic suspension and line 16 transfer. This also means that the 2 lines and 16 lines of future are expected to directly through the transfer channel Unicom maglev site. Cheap Buccaneers Jerseys

according to the plan, the future, the Longyang Road station from north to south in turn to line 7, line 2, the magnetic suspension Cheap Cowboys Jerseys line and line 16, between each adjacent lines Cheap Colts Jerseys can provide convenient transfer through the transfer channel.

没有评论:

发表评论